Loss Control
Risk management includes any conscious action or the decision not to do something that reduces the severity, frequency, or unpredictability of accidental losses.
An example is to post signs when a floor is slippery when wet. Another example is to use flagmen when trucks are bringing loads onto a construction site by the public road.
See Also: